Cold Standby
Under normal operation it is expected that the database and system files are backed up on a regular basis. In case of failure of the main workstation or server, the operator must:
• Make sure that the workstation ports are connected to the management network (i.e. the LAN port is connected).
• Manually start the core services on the cold standby system.
• Connect the clients to the cold standby system once it is up and running.
The requirements for this solution are:
• A second workstation or server – with the same Hardware configuration as the main one, with FOXMAN-UN installed;
• A second FOXMAN-UN license & key for the new hardware.
• Setting up the Main/Standby configuration with the two servers, and selecting “Cold Standby” for the standby server.
This solution is sufficient to provide a standby concept with a recovery time of approximately 10 min. It requires manual intervention.