Hitachi Energy
Class Types
Both basic QoS and HQoS use Class Types for bandwidth and traffic classes control.
Class-Types are required during creation of Service Profiles, and applied to services (VPLS, VPWS), Pseudo Wires, and Tunnels. The Class-Type definition - available in the “Tools” menu of the ENP main window - is therefore the basis for the complete MPLS-TP network and needs to be done as a first step during network configuration & commissioning.
Class-Types can be exported and imported.
ENP Class Type definition dialog
With basic QoS, the alignment of the NE’s QoS reference tables throughout the network is done via the “Schedule Network Alignment” dialog.
ENP “Schedule Network Alignment” task creation dialog
An audit function verifies the alignment of QoS reference tables in the network. Audits can be initiated immediately or on a scheduled, regular basis.
ENP “Schedule Network Audit” task creation dialog
Audit results can be displayed, and the corresponding audit reports are stored in the NEM database. The reports can be exported for further processing.
ENP “Network Audit Last Results” dialog