Hitachi Energy
Prerequisites
The following prerequisites must be met:
The DIRAC server is up and running.
The target SENC1 Functional Units must be enrolled and deployed in the FOX61x network element, including the cabling between the front ports of the core unit and the SENC1 unit.
The encrypted tunnel to be removed is deployed.
FOXMAN-UN and the DIRAC server should be synchronized.