Hitachi Energy
Apply the Work
The created cross connections
The Application is now ready to be applied to the network.
«Apply» to start the down load process to all relevant NEs.
«OK» to close the window.
«Cancel» to exit without making any changes.
The Circuit has now been completed.
The Circuit is maintained in the database.
The cross connections are created which means the MCs are now in a valid state.
If all downloads are successfully applied the network will transport a bi-directional P0_nc signal from A to Z. The Application will state this situation for all selected cross connection with the identification Valid.